Eze Done logo
EZE DONE
ALUMINIUM CONCEPT LTD
← All guides

Ordering

How to read a roofing quotation before you accept it

Check product names, units, quantities, exclusions and delivery scope before comparing the final total.

By Eze Done Aluminium Concept ·

Roofing materials loaded for delivery

A roofing quotation is easier to assess when you can trace the final total back to named products, quantities and unit rates. A single amount may be convenient, but it does not explain whether two offers cover the same materials or services. Read the scope first, then check the arithmetic.

Identify exactly what is being supplied

Look for the product family and profile. “Roofing sheets” is less useful than “long span aluminium” or “Gerard Bond stone-coated tile.” For aluminium, ask for the gauge and standard as well. Eze Done's aluminium price list separates caliper and market standard, so a gauge label by itself does not identify the quoted rate.

Colour should also be clear. If it was agreed from a sample or reference, make sure the quote reflects that agreement. For a made-to-order product, identify the confirmed dimensions or the measurement schedule to which the quotation refers. If the figures are preliminary, have that stated instead of allowing an estimate to become an accidental production instruction.

Check each unit before multiplying

Eze Done's aluminium sheets are sold by the square metre. Its listed stone-coated tiles are sold per sheet. Stone-coated nails are priced per pack, and sealant and sand are priced per set. These distinctions are recorded on the stone-coated price page.

The quantity and unit must match the rate. A figure for 100 sheets cannot be multiplied by an area rate unless a confirmed conversion has been made. Similarly, knowing the price of a pack does not establish the number of individual fixings in that pack or how many packs your roof needs.

For every line, check quantity multiplied by rate against the subtotal. If a line is bundled, ask what the bundle includes. This is a checking method, not a request to reconstruct the installer's take-off yourself: the design and quantity assumptions still need to come from the responsible person.

Find the boundaries of the offer

Ask whether delivery, installation and accessories are included or separately priced. The published long span prices are collection prices from the Lagos factory; delivery is priced by destination. A sheet price should not silently become a delivered and installed roof budget.

Review the accessory range with the installer and identify what belongs in your order. Ridge caps, fixings, sealants and drainage components are different items with different units. Their availability in the catalogue does not mean every order includes them or that a fixed quantity suits every roof.

Also ask the supplier to confirm quotation validity, expected timing, payment arrangements and any other charges that apply to the actual order. The public price pages do not settle these individual commercial terms. Having them recorded avoids relying on an assumption made during a phone conversation.

Compare alternatives line by line

Put two quotations beside each other and match the specifications before comparing totals. If one includes transport and the other does not, ask for the missing transport figure. If the standards differ, ask for comparable specifications. If the quantities differ, find out which measurements or coverage assumptions explain the difference.

Finish by confirming the final version of the quote and keeping it with the agreed product references and measurements. The goal is a document both buyer and supplier can use: the same products, the same quantities, a clear delivery arrangement and a total whose components you understand.

Sources & further reading

Products in this guide

📞 Call NowWhatsApp